King Fahd Stadium
YAZ’s role: Construction surveying, survey control, 3D laser scanning, point cloud registration and as-built documentation.
YAZ Development has provided surveying and technical support on King Fahd Stadium, Riyadh Metro, Diriyah, the Dairab Road project and Jeddah Tower. On each, YAZ’s role was surveying support, not main contracting.
Every project lists our actual role. YAZ provides surveying and technical support; we are not the main contractor on these developments.
YAZ’s role: Construction surveying, survey control, 3D laser scanning, point cloud registration and as-built documentation.
YAZ’s role: Road surveying, infrastructure setting-out and survey control.
YAZ’s role: Surveying workforce and construction surveying support for a super-tall tower.
YAZ provided surveying and technical support, such as survey control, setting-out, laser scanning and as-built documentation. The scope on each project is listed on this page.
No. YAZ was not the main contractor on the projects listed. Each entry describes only YAZ’s own surveying scope.
Riyadh (King Fahd Stadium, Riyadh Metro, Diriyah and the Dairab Road project) and Jeddah (Jeddah Tower).
Message us on WhatsApp or call +966 55 393 2623