High-rise and structural surveying
High-rise surveying controls the position and verticality of a tall structure as it rises. YAZ Development provided surveying workforce and construction surveying support for Jeddah Tower and supports structural surveying on large projects in Saudi Arabia.
When you need it
- Core and column positioning at each level
- Verticality checks as the structure rises
- Facade and structural element setting-out
- Control transfer between levels
How high-rise surveying works
- Establish a stable ground control network
- Transfer control up the structure
- Set out and check each level
- Record verticality and as-built position
What you receive
Level-by-level setting-out records, verticality and as-built reports, and updated control values.
Common questions
What was YAZ’s role on Jeddah Tower?
YAZ provided surveying workforce and construction surveying support for the super-tall tower. YAZ was not the main contractor.
Why is verticality surveying important?
On tall structures small deviations accumulate with height, so positions and plumb are checked at each stage.
Related services
Need Professional Surveying Teams or Geospatial Engineering Services?
Message us on WhatsApp or call +966 55 393 2623